- System name: Guangzhou Metro
- Native name: 广州地铁
- Operational Lines: 5
- Lines Under Construction: 5
- operators
- Name: Operational Metro One
Native name: 运营事业总部车务一部
line: 1, 2, and 8 - Name: Operational Metro Two
Native name: 运营事业总部车务二部
line: 2, and 3 - Name: Operational Metro Three
Native name: 运营事业总部车务三部上
line: 3, 4, and 5
Operational Lines[]
Color | Line | Terminals | Year Opened | Newest Extension | Length (km²) | Stations |
---|---|---|---|---|---|---|
Line 1 | Guangzhou East — Xilang | 1997 | 1999 | 18.4 | 16 | |
Line 2 | Sanyuanli — Xiaogang | 2002 | 2005 | 27.1 | 17 | |
Line 3 | Panyu Square — Guangzhou East/Tianhe Coach Terminal | 2005 | 2006 | 36.3 | 18 | |
Line 4 | Chebeinan — Jinzhou | 2005 | 2009 | 43.6 | 14 | |
Line 5 | Jiaokou — Wenchong | 2009 | — | 31.9 | 24 |
[]